alf · Flux
Library/Accounts/Acme Robotics/Acme — deal doc
Acme Robotics

Acme — deal doc

deal doc · verified 2026-08-19 · demo content
DealAcme Robotics, approvals pilot
StagePilot, week three of four
OwnerDana Olabode
Updated2026-08-19

Internal. What Acme sees is the deck, poc-deck.html in this directory: the pilot objective, the agreed criteria and targets, and the plan. Targets are not restated here.

Company

  • Acme Roboticshardware manufacturing. About 400 people, finance team of 14.
  • Flux tenant slugacme
  • CRM record name"Acme Robotics Inc". Render the account as Acme.

CRM state

Deal "Acme Robotics — approvals pilot", stage Pilot, owner Dana Olabode.

FieldValue
monthly_volume420
current_processshared sheet + email
integration_targetNetLedger, self-hosted. Production release version unknown; connector built against 8.4
close_date2026-09-30, flagged for review 2026-08-17 (security review has not started)
champion_confidencehigh — rep's read, never overwrite

People

IdentityWhoClass
priya.raman@acme.exampleFinance ops lead. Champion. Runs the pilot day to day, submits most requests herself, presents the handovercustomer
tomas.eriksen@acme.exampleController. Primary approver; decided 11 of the 13 requests routed to him in the week to 2026-08-14. Verifies the ERP write-backcustomer
j.whitfield@acme.exampleCFO. Economic buyer — not yet met. Added to the CRM 2026-08-17, invited to the handover. Zero product activitycustomer
head of IT, unnamedOwns the security review. Not yet introducedcustomer
sam.oduya@flux.exampleFlux SE, built the ERP connectorimplementation

Where the pilot stands

CriterionWhere it stands
Approval latencyMet. 31-hour median reported by Priya at the 2026-08-14 review, against the four-day baseline she quoted at kickoff
CoverageOn track. 49 of 54 requests closed in Flux in the week to 2026-08-14
ERP write-backNot started on production. Everything so far ran against the sandbox
HandoverScheduled, week four. Priya presents; the CFO is invited

Open threads

ThreadOwnerState
NetLedger production release versionTomasCommitted 2026-08-14 for the next day. Connector built against 8.4; Tomas believes production is 8.1 or 8.2
Connector field mappingSamWithin a day of the version landing. If the release is 8.1 the mapping differs
Delegation rule, so a backup approver can be exercisedSamConfig change, not a build. Promised to Priya for 2026-08-15
A CFO slot before the handoverPriyaAsked 2026-08-14. "Late next week", no date given
Vendor onboardingOut of pilot scope on purpose. Revisit after the handover

Security review

Statusnot started · Packet sent: 2026-08-15 · Reviewer: not yet assigned · Expected duration: about six weeks, per Tomas

Packet itemOwnerState
Data-handling summarySam Oduyasent 2026-08-15
SOC 2 Type II reportSam Oduyasent 2026-08-15
Subprocessor listSam Oduyasent 2026-08-15
Penetration test summary, most recentSam Oduyaavailable on request
Architecture note, ERP connectorSam Oduyanot written

Acme side:

  • Tomas hands the packet to their head of IT. Name not yet given.
  • No security questionnaire received so far. Their last vendor review used one, so expect it.
  • Acme hosts NetLedger themselves. The connector runs outbound only, which is the point most likely to need an architecture note.

Outstanding:

  1. Get the head of IT named and introduced.
  2. Write the connector architecture note before it is asked for.
  3. Ask whether the review can start before the pilot ends. Serial rather than parallel is what puts the close date at risk.

History

  • 2026-08-17Post-call run on the midpoint review: four CRM updates proposed, all approved by Tilo — integration_target, James Whitfield as a new contact, close_date flagged for review, champion_confidence left alone as a rep field.
  • 2026-08-15Security packet sent to Tomas.
  • 2026-08-14Pilot midpoint review. Latency criterion met. Production ERP write-back unverified. Security review not started, and about six weeks long. CFO named as a handover attendee for the first time.
  • 2026-08-03Scope agreed in writing. Three workstreams; vendor onboarding and expenses explicitly out. The sheet keeps running in parallel.
  • 2026-07-27Workflow configured, first 12 requests routed.
  • 2026-07-24Kickoff. Capex chosen as the pilot workflow over expenses.

The read

  • The CFO has never been in a room with usDeal is mid-Pilot; per deal-stages this is the gap most likely to cost a quarter. Every brief until it is fixed.
  • Security review is the largest risk on the dealClose date is 2026-09-30, the review runs about six weeks here, and it has not begun. Priya thought it was "a form". Acme will not chase it; Flux drives it or it sits.
  • Single-approver concentrationIf Tomas is out, the latency number goes with him. The delegation rule exists to be exercised, not just configured.
  • The ERP is behind the release the connector was built for. Until Sam has the version, the integration criterion is a guess rather than a risk.
  • Expansion, held back on purposePriya says people are asking for vendor onboarding, which annoys them more than capex does. After the handover, not during — widening the test while the ERP check is open trades a result for a wish list.
  • Usage readComes from the product signal, per product-health. Not restated here, and never in client-facing material.

To change this, say it in #sales-ops.← Acme Robotics

as of 19 Aug 2026, 14:22 UTC