Flux
Acme Robotics · capex approvals pilot
Pilot review · week three of four

Flux × Acme

Capex approvals, running on Acme's own process and Acme's own NetLedger, alongside the sheet.

Updated 2026-08-19
Fictional company. Demo material.
What the pilot proves

Capex approvals over $5,000, end to end, on your ERP.

Capex approval workflow

Requests over $5,000 are submitted, routed and decided in Flux Flow, with the full trail retained.

Done when: median approval time is under 48 hours and at least 90% of Q3 capex runs through Flux.

ERP integration

Approved requests write back to your own NetLedger instance. Your production system, not a sandbox.

Done when: Tomas confirms a decided request lands correctly in NetLedger with no manual re-entry.

Handover

Acme can run and explain the workflow without Flux in the room.

Done when: Priya demonstrates it live, end to end, to an internal audience.

Out of scope, agreed 3 August: vendor onboarding, expense approvals, purchase orders, migrating the sheet's history, anything touching payroll. The sheet keeps running for the whole pilot.

Where we are

Agreed in writing on 3 August. Measured on your requests.

CriterionTargetWhere it standsState
Approval latency Median under 48 hours 31-hour median in the week to 14 August, against the four-day baseline Met
Coverage 90% of Q3 capex through Flux 54 requests routed in the week to 14 August, 49 closed in Flux In progress
ERP write-back Verified on production NetLedger Sandbox only so far. Waiting on the production release version to confirm the field mapping Waiting on us both
Handover Priya runs it live, unaided Booked for week four. Tomas, AP, and James attending Scheduled

A criterion that is not met is not met. The pilot ends with the numbers, whatever they say.

The plan

Four weeks, one workflow, nothing switched off.

Week 1 · Aug 3 to 7
Connector built, workflow configured to your routing rules, Priya trained
Week 2 · Aug 10 to 14
Live capex requests routed through Flux. Midpoint review on the 14th
Week 3 · Aug 17 to 21
Production write-back verified. Backup approver configured and exercisedWe are here

If the production check slips, the handover holds and we demonstrate on the pilot's own results rather than on sandbox ones.

Who is involved

Five named people, one unfilled seat.

NameSideRole in the pilot
Priya RamanAcmeFinance ops lead. Runs the pilot day to day and presents the handover
Tomas EriksenAcmeController. Primary approver, and verifies the NetLedger write-back
James WhitfieldAcmeCFO. Attending the handover session
Head of ITAcmeOwns the security review. To be named
Dana OlabodeFluxPilot owner. Weekly checkpoint
Sam OduyaFluxSolutions engineer. Built the connector, ships the config changes
Before the handover

What is left, and who holds each piece.

With Acme
  • Production NetLedger release version (Tomas). The connector was built against 8.4; the mapping differs on 8.1.
  • An introduction to the head of IT (Tomas). The security packet went over on 15 August; Flux drives the review from there.
  • A 20-minute slot with James (Priya) ahead of the handover rather than in it.
With Flux
  • Field mapping confirmed (Sam), within a day of the version landing.
  • Delegation rule shipped (Sam) so a backup approver can be exercised before the handover.
  • Connector architecture note (Sam) for the security review, ahead of being asked.
Next session: handover, week four
Flux · Fictional company. Demo material.